Dynamic backend size for Snowflake jobs (public beta)

Now you can change the backend size of a heavy Snowflake transformation job so that it finishes faster.

There are three backend sizes for you to select from (small, medium, and large). However, you cannot change the backend size if a job is running. Information about the backend size is available on the job detail page.

If you want us to turn this feature on in your project, send us the message “Enable dynamic backend for Snowflake” using the feedback button in the platform.

Note: The feature is available only for non-Pay-as-you-go projects with new transformations.

6
1 reply